Upgrading the kerbing at Lee Point.
Kerbing works were required to be done in stages and could only be completed between 9 and 3pm daily as the roads were not closed to traffic and work could not be done in peak times.
Upgrading the kerbing at Lee Point.
Kerbing works were required to be done in stages and could only be completed between 9 and 3pm daily as the roads were not closed to traffic and work could not be done in peak times.