Installed a flush kerb for Department of Infrastructure so that road could be built up to try and reduce the road from flooding. It was keyed into existing road to give it stability. Once the kerb was installed the new pavement was back filled to the kerb and the new road was completed.
All works were completed while the road was still open to traffic with only lane closures occurring. The extreme heat in September and October was also a factor.